[Waverley ARS] Wrinkles Report
Jim Ayling
jim.ayling at bigpond.com
Sat Jan 6 13:33:41 UTC 2007
Alan,
Thanks for the "Wrinkles Report", received at last. If I had received it from the original transmission I would have known there was a working bee starting at 9:00 am, I could have been there with tools at that time to help instead of 1:00 pm when most of the work had been done.
Don't blame your stupidity, it just should not be that difficult to send a message to members and friends.
73s .......... Jim VK2JA
----- Original Message -----
From: Alan Smith
To: vk2bv
Sent: Saturday, January 06, 2007 5:48 PM
Subject: [Waverley ARS] Wrinkles Report
Please find below copy of report sent to VK2BV.org last Wednesday but did not get through the spam filter due to apparently my own stupidity of not understanding how e-mails are filtered and therefore appologise for the delay
Report below
Alan VK2TUI
Wrinkles Report for Tuesday the 3/1/07
Attendees;
Eddie VK2BEH
Daniel VK2FDGW
Lynn VK2FLTJ
Eric VK2VE
Grant VK2TU
Richard VK2XRC
Jim VK2JA
Raffy VK2RF
Alan VK2TUI
A couple of long coffee breaks and chin wagging, made more enjoyable by the provision of ANZAC biscuits by Jim VK2JA "thanks Jim".
Achievements.
1. Loaded Voice-IP onto server PC and tested successfully from Eddie's portable confirming audio path for remote operation.
2. Lynn VK2FLTJ provided book shelf that fitted at end of operating room and will allow for installation of printer and scanner in the Ops room.
3. Some learning time spent by members with Daniel diagnosing a LED project he had built.
4. Linear removed from console so that Eric can make brackets and feet for it. The linear will be re-installed above the current IC725 transeiver.
5. Monitoring of 52.525Mhz indicated that some DX was around, worked VK2XQ who was calling CQ and working into VK5.
6. Successfully worked Brad VK2CEC on 7.065Mhz. Brad was returning to Sydney from Grafton mobile on 40 meters.
7. Eric removed the Marine receiver from console preparing it for relocation to the "Cape Don" as indicated in previous e-mails.
8. Eric measured up operating room for cladding to be installed on dividing wall. A working bee will install the cladding Saturday 6/1/2007 commencing 9.00AM.
Thanks again to Lynn VK2FLTJ who once again cleaned up the club area vacuumed carpets etc thanks Lynn.
Next Wrinkles Tuesday to occur on Tuesday the 9/1/2007.
P.S.- Bicycle group meeting at the Pavillion (or just riding around the Park) in Centennial Park Sunday 7/1/07 at 8.00AM onwards all welcome 146.50Mhz is the park operational frequency.
73's Alan VK2TUI
Send instant messages to your online friends http://au.messenger.yahoo.com
------------------------------------------------------------------------------
_______________________________________________
Members mailing list
Members at us.cactii.net
http://us.cactii.net/cgi-bin/mailman/listinfo/members
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://us.cactii.net/pipermail/members/attachments/20070107/b181acbb/attachment-0001.htm
More information about the Members
mailing list